• Project Name: Domestic Water Piping Replacement at Criminal Justice Center
  • Location: Sarasota, FL
  • Client: Sarasota County Government
  • Industry: Commercial
  • Size: Approximately $250k

Project Description: This challenging project consisted of replacing the entire domestic domestic water piping system in an eight story building that was fully functional throughout the entire project. This included working above ceilings and inside of walls in the jail, courtrooms, administrative spaces and judges chambers.  All work had to be meticulously planned and scheduled so as not to interrupt the building occupants.  Work was performed during regular business hours as well as at night and on the  weekends.  MIELKE’s scope included replacing all existing galvanized, PVC and copper water mains and branch piping throughout with new CPVC piping.  We also added new drinking fountains and were also responsible for drywall patching & painting, ceiling grid work and new tile as required to patch openings and match existing finishes.  The entire project was completed successfully without any significant interruptions to the building operations.